Disney Filed an Adventureland Permit That Runs Nearly Two Years, and the Contractor Specializes in Rockwork and Themed Structures

Disney Filed an Adventureland Permit That Runs Nearly Two Years, and the Contractor Specializes in Rockwork and Themed Structures

·
Published

Adventureland now has a construction permit on file that does not expire until the end of August 2028.

Walt Disney World filed it on Monday, September 21, WDW News Today reports, and it names a contractor whose specialties include carving rockwork and aging structures. Disney has not said what the work is, and no work has been reported in the area so far.

The wooden bridge into Adventureland at Magic Kingdom on a sunny day, with the Adventureland sign and a burst of spears and dried palm fronds over a timber gateway, green and yellow colonial style buildings on the right and palms on both sides

The bridge into Adventureland, in a September 2025 photo. Photo: WDWMagic

What was filed

According to WDW News Today, the filing names MLC Theming, Inc. for "General Construction" at 4851 Caribbean Way. That address belongs to the Adventureland Popcorn Cart, which sits between Jungle Cruise and The Magic Carpets of Aladdin.

WDW News Today and WDWMagic are both careful about the address. WDW News Today says the permit "could be referencing the general area, not the popcorn cart specifically," and WDWMagic says the permit "could just as easily cover the surrounding area."

An aerial property map of central Adventureland with pink building outlines and address labels, a pin marked Adventureland Popcorn Cart at 4851 Caribbean Way on the walkway below the round Magic Carpets of Aladdin ride, Jungle Cruise at 4845 Caribbean Way further down, and the Enchanted Tiki Room at 4873C Caribbean Way to the upper left

An address map screenshot published by WDWMagic puts 4851 Caribbean Way on the walkway between The Magic Carpets of Aladdin and Jungle Cruise. Image: via WDWMagic

Why the date stands out

The permit expires on August 31, 2028. WDWMagic says most permits run about 12 months, and WDW News Today calls this one "almost one year longer than most permits."

The paperwork sends mixed signals about scale, though. WDWMagic reports that the filing's Notice of Commencement belongs to "WDI's Facilities Asset Management group," and that permits from that group "typically relate to maintenance and refurbishment work, rather than new additions." Its read is that the long window still "points to something more than a simple refresh or repair, even accounting for the fact that this looks to be maintenance-related work."

Who MLC Theming is

WDW News Today describes MLC's specialties as "scenic painting and aging of structures, fabricating facades, carving rock work," and says its portfolio is mostly rockwork and themed structures. WDWMagic calls it "a longtime Disney vendor known for themed area work throughout the parks."

MLC has appeared on several Walt Disney World permits this year. WDW News Today says MLC was listed on a Haunted Mansion permit in August, one that expires after the usual single year. It was also the contractor on the Tower of Terror permit at Hollywood Studios reported in early July, where scaffolding covered the whole front of the building by September 13, and on a January permit at the old Mike Fink Keel Boats landing site beside the Haunted Mansion.

Three cast members in costume chatting under the Adventureland sign, with carved skulls and masks on the timber gateway, a rope strung across the walkway behind them, and a red sign advertising a breakfast bagel sandwich in the right foreground

Cast members under the Adventureland sign, with a rope across the walkway, in a September 2025 photo. Photo: WDWMagic

A second permit nearby

This is the second Adventureland permit reported in less than a week. On September 16, WDWMagic reported a new permit for Walt Disney's Enchanted Tiki Room, which appears on the same address map just to the upper left of the popcorn cart address.

WDWMagic reads that one as likely maintenance. It lists Disney's in-house Buena Vista Construction Company rather than Imagineering, and it had no end date, so WDWMagic says it defaults to the standard one-year expiration. WDWMagic also noted that "the Enchanted Tiki Room isn't listed for any refurbishment closure." Neither outlet connects the two filings.

What we know so far: a permit, a contractor, an address and an end date. In WDW News Today's words, "Official work for the area has not yet been announced or seen." We will keep watching for construction walls in the area.

Sources

Image credits: Both Adventureland photos are by WDWMagic, from its September 15, 2025 gallery of the refurbished Adventureland marquee. The address map is a screenshot published by WDWMagic.

Mentioned in this story

Check out our guides for more on each place in this story:

Related News

Magic Kingdom's Train Station Is Missing Its Metropolis Mutoscope, and Its Railroad Medallions Just Went Generic

Magic Kingdom's Train Station Is Missing Its Metropolis Mutoscope, and Its Railroad Medallions Just Went Generic

A vintage Mutoscope showing Fritz Lang's 1927 film Metropolis is gone from the Main Street, U.S.A. train station, WDW News Today reports. The station's medallion machine has also swapped its Walt Disney World Railroad set, with locomotive numbers on the front and steam engines on the back, for Mickey, Minnie, Donald and Goofy designs with Cinderella Castle on the back.

September 22, 2026 News
Steel Rises Behind Pirates of the Caribbean for a Magic Kingdom Building Labeled MK Park 3 Support Building in District Records

Steel Rises Behind Pirates of the Caribbean for a Magic Kingdom Building Labeled MK Park 3 Support Building in District Records

New aerial photos show steel framing several stories tall and a tall precast concrete column going up backstage at Magic Kingdom, beside the canal where the Electrical Water Pageant barges are moored. Disney has not announced what it is. Blog Mickey reports the Central Florida Tourism Oversight District's records label it the MK Park 3 Support Building, and Park 3 covers the same general area where work on Piston Peak National Park and Villains Land is under way.

September 21, 2026 News
SeaWorld Just Gave Pass Members a Second Free Guest Ticket for September, and This Time Fun Card Holders Get One Too

SeaWorld Just Gave Pass Members a Second Free Guest Ticket for September, and This Time Fun Card Holders Get One Too

SeaWorld Orlando's September Pass Member page now has two JUST ADDED offers: one free bonus guest ticket for Annual Pass Members and one for Fun Card holders, both good any one day from September 21 to 29. Pass Members can also pick up a free one-time Howl-O-Scream Quick Queue voucher at the Pass Member Lounge through September 27, and the $39.99 Howl-O-Scream ticket is on sale through September 26.

September 22, 2026 News
A Pile Driver Now Rises Over Epic Universe's Frankenstein Gate as a New Ride Pit Is Dug Behind Monsters Unchained

A Pile Driver Now Rises Over Epic Universe's Frankenstein Gate as a New Ride Pit Is Dug Behind Monsters Unchained

The crane-mounted pile driver on Epic Universe's Dark Universe expansion plot can now be seen from inside the park, rising over the Frankenstein gate, Orlando ParkStop reports. The ride pit and pile rig already appeared in September 13 aerials. Universal still has not announced the ride, and ParkStop says fan rumors have shifted from a boat ride themed to Creature from the Black Lagoon toward a Bride of Frankenstein indoor coaster.

September 22, 2026 News